Tuesday 8 June 2010

In a tight spot. June 2010

With the demolition work complete it was time for the building team to become conscious about their weight. As the barn had never been blessed with utilities the intricate job of laying pipework and wiring began. With original walls in some areas 1 metre wide space was at a premium which called for some nimble work.
Once complete the concrete arrived and the barn began to take shape once again.
Working in very tight spots

Concrete arrives